A housing development project in Abi Nawas Street in the Karrada district on the Rusafa side of Baghdad. It is considered one of the first large projects in which solar energy systems were used for heating and cooling in 1986, and despite the use of these modern systems, the traditional Baghdadi architecture has been preserved through the materials such as bricks and patterns used in the design and construction.